*********************** List of abbreviations *********************** .. glossary:: dpn double pointed needle(s) fbl from the back loop k knit k2t knit 2 together: pick two stitches at the same time with the working needle, and work them together to decrease one stitch. k2t fbl knit 2 together from the back loop: pick two stitches at the time passing the working needle in the back loop and work them together to decrease one stitch. k3t knit 3 together: pick three stitches at the same time with the working needle and work them together to decrease two stitches. kfb knit front and back m (pass) marker m1l make 1 left m1r make 1 right p purl pm place marker rs right side skp slip 1, knit 1, pass slipped stitch over the stitch just knit to decrease one stitch st stitch sts stitches ws wrong side yo yarn over: pass the yarn over the working needle as if to knit to create a new stitch.